Manufacturing the Future 2012 Part 19 pptx

Manufacturing the Future 2012 Part 19 pptx

Manufacturing the Future 2012 Part 19 pptx

... time 19= k , the states are perturbed [] T x 5.05.01 )19( −= , and the system parameters are changed to 65.0=a , 25.0=b , 45.0=c , and 55.0=d . The controller does not have the information of the ... parameters, either the perturbation of the states. Figure 13 – Fig- ure 15 show the states versus the time step, Figures 16 shows the control in- puts at each time step, a...
Ngày tải lên : 21/06/2014, 19:20
  • 15
  • 242
  • 0
Manufacturing the Future 2012 Part 8 pptx

Manufacturing the Future 2012 Part 8 pptx

... being sent to the SIEM which in turns moves the robot ma- nipulator to pick up the component. At the same time the camera moves on the working space detecting the Zone 2, where the fixed, female ... also sent to the SIRIO, to direct the robot towards the assembly point. Once the part is grasped and in contact with the female component the assembly operation is s...
Ngày tải lên : 21/06/2014, 19:20
  • 50
  • 266
  • 0
Manufacturing the Future 2012 Part 2 potx

Manufacturing the Future 2012 Part 2 potx

... life to the contract. The contract starts at the moment the acceptance reaches the offeror. The cluster manager, and the candidate agents when negotiating the cluster contract will use the offeror-acceptance ... shows the registering sequence in the cluster of two MRAs. Figure 17 shows the main user interface of the agent (CA/MRA) (left part) . The right part...
Ngày tải lên : 21/06/2014, 19:20
  • 50
  • 267
  • 0
Manufacturing the Future 2012 Part 5 potx

Manufacturing the Future 2012 Part 5 potx

... a : the number of parts visit both machines; b : the number of parts visit machine i but not j ; c : the number of parts visit machine j but not i ; d : the num- ber of parts visit neither ... uncover the natural strength of the relationships among the parts and the computational efforts necessary to cal- culate the sequences of length 1 through L. In general, the hi...
Ngày tải lên : 21/06/2014, 19:20
  • 50
  • 318
  • 0
Manufacturing the Future 2012 Part 6 potx

Manufacturing the Future 2012 Part 6 potx

... pallet and moved out of the system. The speed of the AGV is set at 175 feet/minute. Parts arrive to the system on pallets containing 4 parts of type 1, 2 parts of type 2, and 2 parts of type 3 every ... the aged-based model, if a failure oc- curs before the scheduled PM, PM is rescheduled from the time the corrective Manufacturing the Future: Concepts, Technologies &a...
Ngày tải lên : 21/06/2014, 19:20
  • 50
  • 325
  • 0
Manufacturing the Future 2012 Part 9 ppt

Manufacturing the Future 2012 Part 9 ppt

... Fig- ure 6. The diameter of the circular peg was 25 mm and the side of the square peg was also 25 mm. The dimensions of the non-symmetric part, the radi- used-square, was the same as the squared ... system in Zone 1. Manufacturing the Future: Concepts, Technologies & Visions 420 The 2 peaks in the histogram represent the background and the pieces in t...
Ngày tải lên : 21/06/2014, 19:20
  • 50
  • 255
  • 0
Manufacturing the Future 2012 Part 10 ppt

Manufacturing the Future 2012 Part 10 ppt

... consideration. The heaviest and bulkiest part is selected as a base part and then the assembly sequence contin- ues from heavy to light parts. The parts with the least volume, i.e. connective parts, ... stochastic. The new re- placement population is created by the selection of the best performing indivi- duals, among either the offspring or the parents of the offspr...
Ngày tải lên : 21/06/2014, 19:20
  • 50
  • 335
  • 0
Manufacturing the Future 2012 Part 13 potx

Manufacturing the Future 2012 Part 13 potx

... in the direction of axis OY. Manufacturing the Future: Concepts, Technologies & Visions 640 Wi is the weight of the powder component i, and ρ i is the theoretical density of the ... object from the test set. One set of 314 parts with 19 defectives is used as the test set. The accuracy of results for 314 test set parts is shown in Table 7. As Pawlak (199 1)...
Ngày tải lên : 21/06/2014, 19:20
  • 50
  • 267
  • 0
Manufacturing the Future 2012 Part 14 pot

Manufacturing the Future 2012 Part 14 pot

... and the particle size ratio is defined as the ratio of the size of the large par- ticle to the size of the small particle. (a) The effect of the particle size ratio To exam the effect of the particle ... results, the size ratio of the large parti- cle to the small particle should be higher than at least 6.82 so that all small par- ticles can enter the interstices...
Ngày tải lên : 21/06/2014, 19:20
  • 50
  • 232
  • 0
Manufacturing the Future 2012 Part 15 docx

Manufacturing the Future 2012 Part 15 docx

... without the pump. The volume of the pipe is able to calculate by using the length and square of the pipe. The water at the upstream is vacuumed depending on synchronized demand when the water of the ... in the wafer is bow. Bow is therefore monitored. However, the firm currently monitors the THK quality characteris- tic. The synthesized effective measured values o...
Ngày tải lên : 21/06/2014, 19:20
  • 50
  • 284
  • 0