Manufacturing the Future 2012 Part 15 docx
... System Theory, The Journal of Grey System, Manufacturing the Future: Concepts, Technologies & Visions 702 1. they must have the process experience required by the research goals, and 2. they ... when the water of the downstream is used. The water stream has a lead time between from the up- stream to the downstream. However, the siphon is not using of the fu...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 2 potx
... life to the contract. The contract starts at the moment the acceptance reaches the offeror. The cluster manager, and the candidate agents when negotiating the cluster contract will use the offeror-acceptance ... shows the registering sequence in the cluster of two MRAs. Figure 17 shows the main user interface of the agent (CA/MRA) (left part) . The right part...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 5 potx
... a : the number of parts visit both machines; b : the number of parts visit machine i but not j ; c : the number of parts visit machine j but not i ; d : the num- ber of parts visit neither ... between parts j and k which is based on the common sequences of length 1 through L between the two parts. To select the value L, one has to balance the need to uncover the natur...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 6 potx
... pallet and moved out of the system. The speed of the AGV is set at 175 feet/minute. Parts arrive to the system on pallets containing 4 parts of type 1, 2 parts of type 2, and 2 parts of type 3 every ... the aged-based model, if a failure oc- curs before the scheduled PM, PM is rescheduled from the time the corrective Manufacturing the Future: Concepts, Technologies &a...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 8 pptx
... being sent to the SIEM which in turns moves the robot ma- nipulator to pick up the component. At the same time the camera moves on the working space detecting the Zone 2, where the fixed, female ... also sent to the SIRIO, to direct the robot towards the assembly point. Once the part is grasped and in contact with the female component the assembly operation is s...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 9 ppt
... Fig- ure 6. The diameter of the circular peg was 25 mm and the side of the square peg was also 25 mm. The dimensions of the non-symmetric part, the radi- used-square, was the same as the squared ... to the camera positioning system in Zone 1. Manufacturing the Future: Concepts, Technologies & Visions 420 The 2 peaks in the histogram represent the backg...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 10 ppt
... consideration. The heaviest and bulkiest part is selected as a base part and then the assembly sequence contin- ues from heavy to light parts. The parts with the least volume, i.e. connective parts, ... stochastic. The new re- placement population is created by the selection of the best performing indivi- duals, among either the offspring or the parents of the offspr...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 13 potx
... in the direction of axis OY. Manufacturing the Future: Concepts, Technologies & Visions 640 Wi is the weight of the powder component i, and ρ i is the theoretical density of the ... In SRG, there are two kinds of nodes, one for the relevant elements of the component and another for their dimensions and tolerances. By searching through the SRG and coupled with...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 14 pot
... defined as the ratio of the weight of the large particle to the total weight of the powder mix- ture and the particle size ratio is defined as the ratio of the size of the large par- ticle to the size ... par- ticle to the size of the small particle. (a) The effect of the particle size ratio To exam the effect of the particle size ratio of the packing comp...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 17 pdf
... effective way. The issue is how to evaluate and then change the structure of the network. The evolution aspect of the supply chain network structure provides the basis for the change. The development ... loop from the scheduling system to the planning system, the decision made by the scheduling system does not affect the decision at the planning stage; however,...
Ngày tải lên: 21/06/2014, 19:20