Manufacturing the Future 2012 Part 10 ppt

Manufacturing the Future 2012 Part 10 ppt

Manufacturing the Future 2012 Part 10 ppt

... could take. 1100 111 100 0 110 Figure 3. Mutation diagram 0 0100 0 1100 101 00 0 0100 0100 0 00011 1100 1 0 0100 100 00 101 00 0 0100 0 0100 0 0100 0 0101 101 10 100 10 0 0100 00011 1100 1 0100 1 R e p r o ... ][][][] 1111 1100 1 1100 0000000 IIFAS − [][][][] 1111 1101 0 0100 0000000 IIIFAS − [ ][][][] 1111 1100 1100 0 0100 000 IVFAS − [][][][] 111 1100 1 0100...

Ngày tải lên: 21/06/2014, 19:20

50 335 0
Manufacturing the Future 2012 Part 8 pptx

Manufacturing the Future 2012 Part 8 pptx

... being sent to the SIEM which in turns moves the robot ma- nipulator to pick up the component. At the same time the camera moves on the working space detecting the Zone 2, where the fixed, female ... also sent to the SIRIO, to direct the robot towards the assembly point. Once the part is grasped and in contact with the female component the assembly operation is s...

Ngày tải lên: 21/06/2014, 19:20

50 266 0
Manufacturing the Future 2012 Part 9 ppt

Manufacturing the Future 2012 Part 9 ppt

... Fig- ure 6. The diameter of the circular peg was 25 mm and the side of the square peg was also 25 mm. The dimensions of the non-symmetric part, the radi- used-square, was the same as the squared ... system in Zone 1. Manufacturing the Future: Concepts, Technologies & Visions 420 The 2 peaks in the histogram represent the background and the pieces in t...

Ngày tải lên: 21/06/2014, 19:20

50 255 0
Manufacturing the Future 2012 Part 19 pptx

Manufacturing the Future 2012 Part 19 pptx

... −= , and the system parameters are changed to 65.0=a , 25.0=b , 45.0=c , and 55.0=d . The controller does not have the information of the system parameters, either the perturbation of the states. ... at 800=k , and the system parameters are changed to 4= ρ . The controller stabilizes the system in sec 2 under no information of the system changes, either the perturbat...

Ngày tải lên: 21/06/2014, 19:20

15 242 0
Manufacturing the Future 2012 Part 2 potx

Manufacturing the Future 2012 Part 2 potx

... life to the contract. The contract starts at the moment the acceptance reaches the offeror. The cluster manager, and the candidate agents when negotiating the cluster contract will use the offeror-acceptance ... shows the registering sequence in the cluster of two MRAs. Figure 17 shows the main user interface of the agent (CA/MRA) (left part) . The right part...

Ngày tải lên: 21/06/2014, 19:20

50 267 0
Manufacturing the Future 2012 Part 5 potx

Manufacturing the Future 2012 Part 5 potx

... a : the number of parts visit both machines; b : the number of parts visit machine i but not j ; c : the number of parts visit machine j but not i ; d : the num- ber of parts visit neither ... between parts j and k which is based on the common sequences of length 1 through L between the two parts. To select the value L, one has to balance the need to uncover the natur...

Ngày tải lên: 21/06/2014, 19:20

50 318 0
Manufacturing the Future 2012 Part 6 potx

Manufacturing the Future 2012 Part 6 potx

... pallet and moved out of the system. The speed of the AGV is set at 175 feet/minute. Parts arrive to the system on pallets containing 4 parts of type 1, 2 parts of type 2, and 2 parts of type 3 every ... the aged-based model, if a failure oc- curs before the scheduled PM, PM is rescheduled from the time the corrective Manufacturing the Future: Concepts, Technologies &a...

Ngày tải lên: 21/06/2014, 19:20

50 325 0
Manufacturing the Future 2012 Part 13 potx

Manufacturing the Future 2012 Part 13 potx

... 1 21 21 10 10 50 75 0.00034 0.00034 40 ω = 1.4 21 21 10 10 50 75 0.00034 0.00034 40 ω = 1.5 10 10 7 7 68 75 0.00034 0.00034 40 ω = 2 10 10 7 7 70 75 0.00034 0.00034 35 ω = 4 10 10 7 7 ... another tolerance component in the direction of axis OY. Manufacturing the Future: Concepts, Technologies & Visions 640 Wi is the weight of the powder component i, and...

Ngày tải lên: 21/06/2014, 19:20

50 267 0
Manufacturing the Future 2012 Part 14 pot

Manufacturing the Future 2012 Part 14 pot

... defined as the ratio of the weight of the large particle to the total weight of the powder mix- ture and the particle size ratio is defined as the ratio of the size of the large par- ticle to the size ... par- ticle to the size of the small particle. (a) The effect of the particle size ratio To exam the effect of the particle size ratio of the packing comp...

Ngày tải lên: 21/06/2014, 19:20

50 232 0
Manufacturing the Future 2012 Part 15 docx

Manufacturing the Future 2012 Part 15 docx

... System Theory, The Journal of Grey System, Manufacturing the Future: Concepts, Technologies & Visions 702 1. they must have the process experience required by the research goals, and 2. they ... when the water of the downstream is used. The water stream has a lead time between from the up- stream to the downstream. However, the siphon is not using of the fu...

Ngày tải lên: 21/06/2014, 19:20

50 284 0
w