Manufacturing the Future 2012 Part 6 potx
... pallet and moved out of the system. The speed of the AGV is set at 175 feet/minute. Parts arrive to the system on pallets containing 4 parts of type 1, 2 parts of type 2, and 2 parts of type 3 every ... the aged-based model, if a failure oc- curs before the scheduled PM, PM is rescheduled from the time the corrective Manufacturing the Future: Concepts, Technologies &a...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 2 potx
... life to the contract. The contract starts at the moment the acceptance reaches the offeror. The cluster manager, and the candidate agents when negotiating the cluster contract will use the offeror-acceptance ... shows the registering sequence in the cluster of two MRAs. Figure 17 shows the main user interface of the agent (CA/MRA) (left part) . The right part...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 5 potx
... 30*40 6 65 . Kumar & Vannelli 1987 30*41 2,3,9 66 . Balasubramanian & Panneerselvam 1993 36* 21 7 67 . King & Nakornchai 1982 36* 90 4, 5 68 . McCormick et al. 1972 37*53 4,5 ,6 69 . Chandrasekharan ... (5) ⎩ ⎨ ⎧ = .otherwise ,0 ,part uses machine if ,1 ki a ik (6) k : part index (k =1,… P ), is the k th part in the machine -part matrix. We use figure 2 an...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 13 potx
... 5 96. 2% 3 120 6 5 2 1 26 7 94.7% 120 7 6 0 127 6 95.5% 4 119 6 6 3 125 9 93.3% 119 7 8 0 1 26 8 94.0% 5 121 6 4 2 127 6 95.5% 121 6 3 3 127 6 95.5% Avg. 120.2 6. 2 5 2 1 26. 4 7 94.8% 120.8 6. 4 ... in the direction of axis OY. Manufacturing the Future: Concepts, Technologies & Visions 64 0 Wi is the weight of the powder component i, and ρ i is...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 8 pptx
... Yes 1,13 1 76, 7 145,1 104° -1,70 -0,1 34 83,8 103,0 0 3 circle 9 circle Yes 1,24 56, 6 143,1 79° 3,4 1,9 -1 79 ,6 102,0 3,2 2,2 circle 10 square Yes 1,7 56, 6 42,8 66 ° 17,2 2,2 -24 79 ,6 102,0 3,5 ... square 22 rad No 1,84 61 ,5 45,7 26 14,3 -0,7 -4 83,8 148,0 -1 ,6 -0,2 rad 23 rad No 1, 26 175,7 49 ,6 36 -0,70 -4 ,6 -4 82,8 103,0 -2,7 0,2 rad 24 rad No 1,21 179 ,6 147 49° -...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 9 ppt
... Fig- ure 6. The diameter of the circular peg was 25 mm and the side of the square peg was also 25 mm. The dimensions of the non-symmetric part, the radi- used-square, was the same as the squared ... 100 .6 0.2 0.5 Y 5 R Y 1:14 29.4 62 .4 145.1 36 0.2 -0.3 -4 84.9 100.7 0 0.4 Y 6 R Y 1:19 29 .6 67.3 44.8 48 3.1 -0.7 -2 85.3 101 .6 -0.4 -0.5 Y 7 C Y 1:15 29 .6 180...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 10 ppt
... consideration. The heaviest and bulkiest part is selected as a base part and then the assembly sequence contin- ues from heavy to light parts. The parts with the least volume, i.e. connective parts, ... representation of the simple G.A. Manufacturing the Future: Concepts, Technologies & Visions 458 The difference of weight Dw is kgCwOwDw 368 .040 06. 0 768 6.0 22...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 14 pot
... 0.84 33 3 #2+#4 ( 16. 0~38 .6) : 1 0 .65 0 .63 0. 86 32 4 #5+#7 6. 82: 1 0 .63 0 .63 0.71 13 5 #2+ #6 (5 .67 ~10 .6) : 1 0 .65 0 .60 0.71 9 6 #1+#2 3.74:1 0 .63 0 .63 0.72 14 Manufacturing the Future: Concepts, ... total weight of the powder mix- ture and the particle size ratio is defined as the ratio of the size of the large par- ticle to the size of the small p...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 15 docx
... 0.241 35 6 6.925 0.154 16 10 10.000 - 36 15 6. 5 16 0. 566 17 6 6.239 0.040 37 14 - - - 18 8 7.551 0.079 38 14 - - - 19 9 9.139 0.015 39 18 - - - 20 12 11. 061 0.078 40 27 - - - Table 6. Verifying ... 7.8 26 0.022 30 7 6. 903 0.014 11 8 8.320 0.040 31 9 8.845 0.017 12 9 8.845 0.017 0.0 26 32 8 8.320 0.040 13 6 9.403 0. 567 33 8 7.8 26 0.022 0.041 14 5 9.9 96 0.10...
Ngày tải lên: 21/06/2014, 19:20
Manufacturing the Future 2012 Part 17 pdf
... effective way. The issue is how to evaluate and then change the structure of the network. The evolution aspect of the supply chain network structure provides the basis for the change. The development ... loop from the scheduling system to the planning system, the decision made by the scheduling system does not affect the decision at the planning stage; however,...
Ngày tải lên: 21/06/2014, 19:20