... xii Preface xiii 1 Ever-present danger: an introduction to the principles of risk management 1 1 .1 Introduction 1 1.2 The principles of risk assessment 2 1. 3 The risk assessment matrix 3 1. 4 Risk evaluation ... Risk evaluation and control 4 1. 5 Dependability 5 1. 6 The risk management process 5 1. 7 Examples of risk management failures 5...
Ngày tải lên: 21/06/2014, 12:20
... EHSRs. 18 The risk management of safety and dependability © Woodhead Publishing Limited, 2 010 1. 9 Summary The need for management and engineers to focus on the risks to safety in their work ... ensure the health and safety of the workforce, including the subcontractors. In general the regulations reinforce the requirements of t...
Ngày tải lên: 21/06/2014, 12:20
The Risk Management of Safety and Dependability_5 pot
... probability of failure of each item. 13 6 The risk management of safety and dependability © Woodhead Publishing Limited, 2 010 assuming λT is << ;1 and failure occurs at the start of the ... should be noted that the value of the approxi- mate equation is shown and the limitation to its use can be seen from the table. ...
Ngày tải lên: 21/06/2014, 12:20
The Risk Management of Safety and Dependability_6 pot
... 14 0 The risk management of safety and dependability © Woodhead Publishing Limited, 2 010 The probability of failure of the shutdown system would then be 0.0 012 + 0.00005 = 0.0 012 5. It ... cannot be emphasised enough the importance of ensuring the maintenance of each element, which is so often neglected in 16 4 The risk management o...
Ngày tải lên: 21/06/2014, 12:20
The Risk Management of Safety and Dependability_7 pot
... size 12 345678 910 1 5.0 2.53 1. 70 1. 27 1. 02 0.85 0.73 0.64 0.57 0. 51 2 13 .54 13 .54 9.76 7.64 6.28 5.34 4.64 4 .10 3.68 3 36.84 24.86 18 .93 15 .32 12 .88 11 .11 9.77 8.73 4 47.29 34.26 27 .13 22.53 19 .29 16 .88 15 .00 5 ... 5400 Failures 1 1 1 1 1 Rank j 12 34 5 Cumulative 20 40 60 80 10 0 Median Rank 12 .9 31. 5 50 68.5 87 17 0 The risk m...
Ngày tải lên: 21/06/2014, 12:20
The Risk Management of Safety and Dependability_8 pdf
... depend on the relative areas, the distance apart, the resistivity of the electrolyte and the chemical composition of the fl uid. 206 The risk management of safety and dependability ... crane working on the construction of a block of fl ats collapsed. The driver was killed as was a member of the public who 19 8 The r...
Ngày tải lên: 21/06/2014, 12:20
The Risk Management of Safety and Dependability_10 pdf
... 10 9 risk matrix, 10 6 starting air manual control system FMECA, 11 1 hazard and operability studies, 11 0 17 application example, 11 2 13 guide words, 11 2 other applications, 11 3, 11 7 piping and instrument ... failures, 210 13 failure statistics, 210 12 , 211 inspection intervals, 210 percentage distribution of root causes of failures, 211 risk ranking, 212 13...
Ngày tải lên: 21/06/2014, 12:20
The risk management of safety and dependability_1 pot
... noise level for a 12 -hour shift: 85 = 10 × log 10 (1/ 8 × 12 × 10 (L p1 /10 ) ) antilog 8.5 = 1. 5 × 10 (L p1 /10 ) 316 ,227,77 = 1. 5 × 10 (L p1 /10 ) log 10 316 ,227,77 /1. 5 = L p1 /10 therefore L p ... (bars) 0 0 15 1. 013 500 16 40 11 .8 0.954 10 00 32 81 8.5 0.898 15 00 49 21 5.3 0.845 3000 9843 −4.5 0.7 01 6000 19 685 −24 0.4 71 10000 32808 −50 0.26...
Ngày tải lên: 21/06/2014, 23:20
The risk management of safety and dependability_3 pot
... remember the old adage, ‘Lies, 12 4 The risk management of safety and dependability © Woodhead Publishing Limited, 2 010 safety system. They are the barriers to an accident and each ... elements fails then the whole control system fails. If the control system fails, then the system depends on the reliability of the pressure safety relief...
Ngày tải lên: 21/06/2014, 23:20
The risk management of safety and dependability_5 doc
... size 12 345678 910 1 5.0 2.53 1. 70 1. 27 1. 02 0.85 0.73 0.64 0.57 0. 51 2 13 .54 13 .54 9.76 7.64 6.28 5.34 4.64 4 .10 3.68 3 36.84 24.86 18 .93 15 .32 12 .88 11 .11 9.77 8.73 4 47.29 34.26 27 .13 22.53 19 .29 ... sets Hours 670 15 04 3200 4200 5400 Failures 1 1 1 1 1 Rank j 12 34 5 Cumulative 20 40 60 80 10 0 Median Rank 12 .9 31. 5 50 68.5 87 19 0...
Ngày tải lên: 21/06/2014, 23:20