Knowledge Management Part 8 pot

Knowledge Management Part 8 pot

Knowledge Management Part 8 pot

... of knowledge management, IBM Systems Journal, 40(4), pp .88 9-907. AnOntologicalFrameworkfor Knowledge Management inSystemsEngineeringProcesses 149 An Ontological Framework for Knowledge ... F1 P R F1 Q1 98. 01 49.50 65. 78 99.34 50.17 66.67 Q2 100.00 100.00 100.00 100.00 100.00 100.00 Q3 95 .86 50.00 65.72 96.05 50.15 65 .89 Q4 51.22 33 .87 40. 7...
Ngày tải lên : 21/06/2014, 07:20
  • 20
  • 193
  • 0
Energy Technology and Management Part 8 pot

Energy Technology and Management Part 8 pot

... 50-51(S) 47- 48( S) 11-66(T) 10-11(S) 67- 68( S) 50-51(S) 47- 48( S) Power loss(kW) 109.60 83 .77 83 . 78 83 .80 83 .80 83 .81 84 .81 Node of lowest voltage 53 52 51 50 50 50 50 Lowest voltage ... Energy Technology and Management 1 48 Test Frames True False Accuracy (%) 1 151 133 18 88 2 240 214 26 89 3 100 90 10 90 4 180 152 28 84 Average 167 147 20 88...
Ngày tải lên : 19/06/2014, 10:20
  • 20
  • 350
  • 0
Knowledge Management Part 4 potx

Knowledge Management Part 4 potx

... Keywords: Knowledge, Actor-network, Design, Project Management, Engineering Education Research 5 Knowledge Management7 2 Knowledge Management6 2 probably you can reuse the knowledge you ... to convert knowledge into Knowledge Management5 8 1. Introduction In this paper we address the four areas of knowledge identified in the title integrated in a space of knowledge...
Ngày tải lên : 21/06/2014, 07:20
  • 20
  • 219
  • 0
Knowledge Management Part 10 potx

Knowledge Management Part 10 potx

... J. (1 985 ). Knowledge Representation as the Basis for Requirements Specifications. IEEE Computer, Vol. 18, No. 4, pp. 82 -91 Borst, W.N. (1997). Construction of Engineering Ontologies for Knowledge ... posts are beginners in the Knowledge Management1 82  Fig. 1. Semantic nets consist of nodes and arcs to represent knowledge In a Special Interest Group (SIG) knowledge portal...
Ngày tải lên : 21/06/2014, 07:20
  • 20
  • 150
  • 0
Knowledge Management Part 11 potx

Knowledge Management Part 11 potx

... 6 5 3 2 CH S 1 S 13 S 24 S 55 S 68 S 70 S 71 S 78 S 79 S 93 T 8 * * * * 1 * * * * * T 12 * * * * x * * 1 * * Knowledge Management1 98 Firstly, we will illustrate the problem ... Ontology-based Knowledge Management System (NOKMS) (Saad et al., 2008c). The architecture consists of three layers: (Negotiation Layer (NL), Semantic Layer (SEL) and Knowledge Management...
Ngày tải lên : 21/06/2014, 07:20
  • 20
  • 148
  • 0
Integrated Waste Management Volume II Part 8 potx

Integrated Waste Management Volume II Part 8 potx

... Pakistan 10.0 13.1 18. 7 Lagos, Nigeria 7.2 10.6 15 .8 Beijing, China 9 .8 12.4 15.0 Manila, Philippines 10.0 11.6 14.9 Buenos Aires, Argentina 11 .8 13.1 13.7 Los Angeles, USA 11 .8 12 .8 13.7 Al-Qahirah ... between 184 0 and 188 0 from about 0 .8 to 1.4 tons per hectare. Use of phosphoric instead of sulphuric acid for apatite dissolution resulted in triple superphosphates bein...
Ngày tải lên : 19/06/2014, 14:20
  • 35
  • 347
  • 0
Risk Management in Environment Production and Economy Part 8 potx

Risk Management in Environment Production and Economy Part 8 potx

... and Engineering Management, Singapore, 8- 11 December 20 08, pp. 1154-11 58. Hillson D. (2002). Extending the risk process to manage opportunities. International Journal of Project Management, Vol.20, ... analysis: construction project risk management system. Advances in Engineering Software, Vol.32, No.10-11, pp. 84 7 85 7. Chapman, C. & Ward, S. (2004). Project risk managem...
Ngày tải lên : 19/06/2014, 19:20
  • 20
  • 364
  • 0
Supply Chain Management New Perspectives Part 8 pot

Supply Chain Management New Perspectives Part 8 pot

... Stadtler, H., 2005, Supply chain management and advanced planning-basics, overview and challenges, European Journal of Operational Research, 163, 575- 588 . Supply Chain Management - New Perspectives ... (2010). Challenges in business systems integration. Computers in Industry, 61 (August 2010), pp. 80 8 81 2 A Supporting Decision Tool for the Integrated Planning of a Logistic N...
Ngày tải lên : 19/06/2014, 19:20
  • 40
  • 325
  • 0
Supply Chain Management 2011 Part 8 potx

Supply Chain Management 2011 Part 8 potx

... Logistics, Vol.7, No. 1, pp. 68- 88 Ansari, A. (1 986 ), Strategies for the Implementation of JIT Purchasing. International Journal of Physical Distribution & Materials Management, Vol.16, No. 7, ... (1 988 ), Management of Materials under Just-in-Time Inventory System: A New Look. Journal of Business Logistics, Vol.9, No. 2, pp. 89 -102 Bagchi, P.K., Raghunathan, T.S., and Bardi...
Ngày tải lên : 20/06/2014, 04:20
  • 40
  • 252
  • 0
Từ khóa: