Nuclear Power Deployment Operation and Sustainability Part 2 pot

Nuclear Power Deployment Operation and Sustainability Part 2 pot

Nuclear Power Deployment Operation and Sustainability Part 2 pot

... reactors 0 5 10 15 20 25 30 20 00 20 20 20 40 20 60 20 80 21 00 Fast reactor share of nuclear- generated electricity (GWe-year-FR/GWe-year-total) 1. 12% growth 1.75% growth 2. 66% growth 3.30% growth Assessment of Deployment ... reactors 0 50 100 150 20 0 25 0 20 00 20 20 20 40 20 60 20 80 21 00 Fast reactor electricity generation (GWe-year) 1. 12% growth 1.75% growth...
Ngày tải lên : 19/06/2014, 15:20
  • 35
  • 367
  • 0
Nuclear Power Deployment Operation and Sustainability Part 3 potx

Nuclear Power Deployment Operation and Sustainability Part 3 potx

... breeding performance and/ or reprocessing plan by itself. Year LWR LWR-MOX Monju and FR Demo. FR 0 10 20 30 40 50 60 70 80 90 20 00 20 25 20 50 20 75 21 00 21 25 21 50 21 75 22 00 Nuclear Power Generation ... 18 322 .38 Percentage of Paths Abandoned 0. 72% 0.74% 0. 72% 0. 52% 1.00% 0.74% Emission Reduction Amount (Millions tonnes CO2e) 325 .84 325 .91 325 .81 326 ....
Ngày tải lên : 19/06/2014, 15:20
  • 35
  • 369
  • 0
Nuclear Power Deployment Operation and Sustainability Part 5 potx

Nuclear Power Deployment Operation and Sustainability Part 5 potx

... deals Part 2 Operation and Decomissioning Nuclear Power – Deployment, Operation and Sustainability 160 with the irradiation embrittlement of the RPV weld area heat affected zone and the ... pressure equals 2. 4 MPa. It is clearly higher at some plants than is allowed for Nuclear Power – Deployment, Operation and Sustainability 1 32 two intergenera...
Ngày tải lên : 19/06/2014, 15:20
  • 35
  • 373
  • 0
Nuclear Power Deployment Operation and Sustainability Part 6 pot

Nuclear Power Deployment Operation and Sustainability Part 6 pot

... 20 05) and (Katona et al, 20 09b): Nuclear Power – Deployment, Operation and Sustainability 194 IAEA (20 00). Safety issues and their ranking for WWER-1000 model “small series” nuclear power ... S. (20 08). Extension of Operational Life-Time of VVER-440 /21 3 Type Units at Paks Nuclear Power Plant. Nuclear Engineering and Technology 40:(4) pp. 26 9 -27 6....
Ngày tải lên : 19/06/2014, 15:20
  • 35
  • 371
  • 0
Nuclear Power Deployment Operation and Sustainability Part 11 pot

Nuclear Power Deployment Operation and Sustainability Part 11 pot

... 1.4 1 .2 1.0 12% 23 3 U + 88% 23 2 Th 12% 23 3 U + 82% 23 2 Th + 6% 23 1 Pa 12% 23 3 U + 86% 23 2 Th + 2% 23 1 Pa Nuclear Power – Deployment, Operation and Sustainability 3 42 practically ... 20 25 30 Neutron multiplication factor 1.5 1.4 1.3 1.4 1 .2 1.0 12% 23 3 U + 88% 23 2 Th 12% 23 3 U + 76% 23 2 Th + 12% 2...
Ngày tải lên : 19/06/2014, 15:20
  • 35
  • 118
  • 0
Nuclear Power Deployment Operation and Sustainability Part 13 potx

Nuclear Power Deployment Operation and Sustainability Part 13 potx

... al., 20 02] . 23 2 Th(n, 2n & , n ) 23 1 Th (  ) 23 1 Pa(n, ) 23 2 Pa (  ) 23 2 U 23 0 Th(n,  ) 23 1 Th (  ) 23 1 Pa(n, ) 23 2 Pa (  ) 23 2 U 23 3 U(n, 2n & , n) 23 2 U These ... power reactors. Nuclear Power – Deployment, Operation and Sustainability 426 The standard fuel salt of FUJI is 7 LiF-BeF 2 -ThF 4 -UF 4 (69.78-18- 12- 0 .2...
Ngày tải lên : 19/06/2014, 15:20
  • 35
  • 211
  • 0
Nuclear Power Deployment Operation and Sustainability Part 14 pot

Nuclear Power Deployment Operation and Sustainability Part 14 pot

... 22 0 489 124 149 20 -21 pm 74% 740 26 0 578 147 176 21 -22 pm 66% 660 340 756 1 92 230 22 -23 pm 60% 600 400 889 22 6 27 1 23 pm-1am 54% 540 460 1 022 26 0 3 12 (a) The thermal efficiency of power generation ... following (2- 4): CH 4 + H 2 O = CO + 3H 2 Methane steam reforming H 0 29 8K = +20 6 kJ/mol (2) CO + H 2 O = CO 2 + H 2 Water gas shift H 0 29 8K = -41...
Ngày tải lên : 19/06/2014, 15:20
  • 35
  • 241
  • 0
Nuclear Power Deployment Operation and Sustainability Part 1 doc

Nuclear Power Deployment Operation and Sustainability Part 1 doc

... and Takashi Namba Chapter 5 Nuclear Proliferation 113 Michael Zentner Chapter 6 Ethics of Nuclear Power: How to Understand Sustainability in the Nuclear Debate 129 Behnam Taebi Part 2 Operation ... Rated power shaft horse power, [shp] [MW] * A2W 35,000 26 .1 A4W/A1G 140,000 104.4 C1W 40,000 29 .8 D2G 35,000 26 .1 S5W 15,000 11 .2 S5G 17,000 12. 7 S6W 35,...
Ngày tải lên : 19/06/2014, 15:20
  • 35
  • 328
  • 0
Nuclear Power Deployment Operation and Sustainability Part 4 ppt

Nuclear Power Deployment Operation and Sustainability Part 4 ppt

... FR deployment. Nuclear Power Plant Capacity(GWe) 0 10 20 30 40 50 60 70 80 20 00 20 25 20 50 20 75 21 00 21 25 21 50 21 75 22 00 LWR High Burnup LWR Next Generation LWR L-MOX FR Year Fig. 17. FR deployment ... case Nuclear Power Plant Capacity(GWe) 0 10 20 30 40 50 60 70 80 20 00 20 25 20 50 20 75 21 00 21 25 21 50 21 75 22 00 LWR High Burnup LWR N...
Ngày tải lên : 19/06/2014, 15:20
  • 35
  • 259
  • 0
Nuclear Power Deployment Operation and Sustainability Part 7 pdf

Nuclear Power Deployment Operation and Sustainability Part 7 pdf

... Management Act (HWMA)/RCRA Partial Permit, EBR-II, EPA ID No. ID4890008 92, effective December 10, 20 02 (Part B). Nuclear Power - Deployment, Operation and Sustainability 22 8 Fig. 8. Vent line ... algae, and bacteria to within processing requirements for the Unit’s 2/ 3 systems. Nuclear Power - Deployment, Operation and Sustainability 21 2 In respo...
Ngày tải lên : 19/06/2014, 15:20
  • 35
  • 343
  • 0

Xem thêm