... attribute A1,A2,A3,…, An, AND there is manufacturing time T and cost M,THEN process P of capabilities C1,C2,C3,…,Cm, AND processing time Tp and cost Mp is used.where Tp T and Mp M.ՅՅ© 2001 by ... as machine and tool capacity, production volume, and overhead cost.With its function, capability, and efficiency specified as above, a manufacturing process can be defined,selected, and evaluated ... short manufacturing time and lowcost. This requirement is specified as the efficiency of the process. If the process efficiency is evaluated by manufacturing time and cost, it can be calculated and...