... and Starting SystemsSystems 11:1 5-1 2:00 Classroom/Shop Discussion/Activity Battery, Charging and Starting Battery, Charging and Starting SystemsSystems 12:0 0-1 :00 LUNCH 1:0 0-2 :30 Classroom/Shop ... and Starting SystemsSystems 2:3 0-2 :45 BREAK 2:4 5-4 :00 Classroom/Shop Discussion/Activity Battery, Charging and Starting Battery, Charging and Starting SystemsSystems...
Ngày tải lên: 13/12/2013, 05:15
... motor- ing is in the case of pumped hydroelectric storage or tidal power plants, where large water pumps are oper- ated reversibly as turbine generators. 85 Electric Power Systems: A Conceptual Introduction, ... may ignite. It was the development of hydrogen cooling systems that provided for the increase in the size and efficiency of state-of-the-art generators in the 1940s and 1950s. All...
Ngày tải lên: 18/02/2014, 22:20
Cisco Systems - Managing IP tracffic with access lists pptx
... operational router © 2002, Cisco Systems, Inc. All rights reserved. ICND v2.0— 6-4 © 2002, Cisco Systems, Inc. All rights reserved. 4 Access Lists and Their Applications © 2002, Cisco Systems, Inc. All ... protocols. © 2002, Cisco Systems, Inc. All rights reserved. ICND v2.0— 6-1 1 Testing Packets with Standard Access Lists © 2002, Cisco Systems, Inc. All rights reserve...
Ngày tải lên: 06/03/2014, 15:20
CCNA -P1 - Course Introduction
... 2002, Cisco Systems, Inc. All rights reserved. © 2002, Cisco Systems, Inc. All rights reserved. ICND 2.0— 0-1 0 Cisco Icons and Symbols © 2002, Cisco Systems, Inc. All rights reserved. ICND 2.0— 0-1 1 Learner ... 2.0— 0-1 1 Learner Introductions • Your name • Your company • Skills and knowledge • Brief history • Objective © 2002, Cisco Systems, Inc. All rights reserved. 2...
Ngày tải lên: 08/07/2013, 01:27
CMP book embedded systems design - introduction
... use of microprocessors in the engine-management system. The open-loop fuel control system, characterized by a carburetor, is now a fuel- injected, closed-loop system using multiple sensors to ... architectures. Embedded systems are usually cost sensitive. Embedded systems have real-time constraints. Note You’ll have ample opportunity to learn about real time. For now, real- tim...
Ngày tải lên: 30/09/2013, 01:20
Tài liệu Cisco - Network Consultants Handbook pptx
... [207.69.220.81] 2 cisco- f 0-1 -0 .norva3.mindspring.net [207.69.220.65] 3 s1 0-0 -1 .vienna1-cr3.bbnplanet.net [4.1.5.237] 4 p 4-2 .vienna1-nbr2.bbnplanet.net [4.0.1.133] 5 p 4-0 .washdc3-br2.bbnplanet.net ... [4.0.1.97] 6 p 3-0 .washdc3-br1.bbnplanet.net [4.24.4.145] 7 p 2-0 .chcgil1-br2.bbnplanet.net [4.24.6.93] 8 p 4-0 .chcgil1-br1.bbnplanet.net [4.24.5.225]...
Ngày tải lên: 10/12/2013, 14:16
Tài liệu Cisco IP telephony Introduction docx
... Filter COUNTRY- CODE DOES-NOT-EXIST 9 [ 2-9 ]11 9 [ 2-9 ]XX XXXX 9 [ 2-9 ]XX [ 2-9 ]XX XXXX 9 011 3[ 0-4 69] ! 9 1 [ 2-9 ]XX [ 2-9 ]XX XXXX Added: no COUNTRY-CODE Added: no COUNTRY-CODE Added: no COUNTRY-CODE Added: ... 900 9 [ 2-9 ]11 9 [ 2-9 ]XX XXXX 9 [ 2-9 ]XX [ 2-9 ]XX XXXX 9 011 3[ 0-4 69] ! 9 1 [ 2-9 ]XX [ 2-9 ]XX XXXX Not added: no AREA-CODE Not added: no A...
Ngày tải lên: 10/12/2013, 16:15
Tài liệu Design Considerations for Cisco PanGo Asset Tracking pptx
... Americas Headquarters: © 2007 Cisco Systems, Inc. All rights reserved. Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA 9513 4-1 706 USA Design Considerations for Cisco PanGo Asset Tracking This ... 14 Design Considerations for Cisco PanGo Asset Tracking OL-1326 8-0 1 PanGo Locator and Cisco WCS PanGo Locator and Cisco WCS As has just been described, both the Ci...
Ngày tải lên: 10/12/2013, 16:16
Tài liệu Cisco Ios Access Lists pptx
... Cisco IOS Access lists Page 144 i - IS-IS, L1 - IS-IS level-1, L2 - IS-IS level-2, * - candidate default U - per-user static route, o - ODR Gateway of last ... following: Codes: C - connected, S - static, I - IGRP, R - RIP, M - mobile, B - BGP D - EIGRP, EX - EIGRP external, O - OSPF, IA - OSPF inter area N1 -...
Ngày tải lên: 11/12/2013, 00:15
Tài liệu 1 - 4 CCNA 3: Switching Basics and Intermediate Routing v 3.0 - Lab 7.2.6 Copyright 2003, Cisco Systems, Inc. Lab 7.2.6 Spanning Tree Recalculation docx
... 1 - 4 CCNA 3: Switching Basics and Intermediate Routing v 3.0 - Lab 7.2.6 Copyright 2003, Cisco Systems, Inc. Lab 7.2.6 Spanning Tree Recalculation ... troubleshoot the hosts and switches configurations. 2 - 4 CCNA 3: Switching Basics and Intermediate Routing v 3.0 - Lab 7.2.6 Copyright 2003, Cisco Systems, Inc. Step 4 Look at the show interface ... Port # S...
Ngày tải lên: 11/12/2013, 14:15