... agile software development);• Project management information system (e.g., an automated tool, such as a scheduling software tool, a configuration management system, an information collection ... manageable parts. The work package is the work defined at the lowest level of the WBS for which cost and duration can be estimated and managed. The level of decomposition is often guided by the ... manager, along with the project management team, directs the performance of the planned project activities and manages the various technical and organizational interfaces that exist within the project....