Accelerated Logistics - Streamlining the Army’s Supply Chain docx

Tài liệu Examining the Army’s Future Warrior - Force-on-Force Simulation of Candidate Technologies pdf

Tài liệu Examining the Army’s Future Warrior - Force-on-Force Simulation of Candidate Technologies pdf

... https://webportal.saalt.army.mil/sard-asb/ASBDownloads/OFS-Vol-III-All.pdf. xii Examining the Army’s Future Warrior stressing scenarios. The effort focuses on a series of research ques- tions, starting with How might a current-generation ... major program of the Army’s transformation plan. In coordination with the lead system in- 2 Examining the Army’s Future Warrior tegrator...
Replacing and Repairing Equipment Used in Iraq and Afghanistan: The Army’s Reset Program ppt

Replacing and Repairing Equipment Used in Iraq and Afghanistan: The Army’s Reset Program ppt

... deployed there. Others have stated that the harsh operat- ing conditions in Southwest Asia are damaging the Army’s equipment. To assess whether the service can equip units not deployed to the theater, ... in the theater permanently (in the pool of so-called theater provided equipment, or TPE), and the other two-thirds is redeployed with units that return home. Typically,...
Ngày tải lên : 08/03/2014, 12:20
  • 58
  • 559
  • 0
The Lean Sustainable Supply Chain ppt

The Lean Sustainable Supply Chain ppt

... receiving. With the Green variable for the supply chain, the vendor will not have to ship the product as often as the just-in-time arrangement from the retailer. This saves in mileage traveled by the manufacturer, ... partners share their knowledge of the best-of- breed technology in the companies. The overriding theme for these conferences is that both parties reali...
Ngày tải lên : 16/03/2014, 20:21
  • 450
  • 547
  • 0
Lessons from the Army''''s Future Combat Systems Program doc

Lessons from the Army''''s Future Combat Systems Program doc

... Lessons from the Army Future Combat Systems Program e Army Vision was, in eect, the prime mover for the FCS program. In addi- tion to placing the weight of the Chief of Sta rmly behind the project, ... transformation would be state-of -the- art, though as yet unknown, technological solutions. Widely recognized as a bid to recapture the Army’s perceived declining relevanc...
Ngày tải lên : 23/03/2014, 02:20
  • 374
  • 322
  • 0
The Value and Impacts of Alternative Fuel Distribution Concepts- Assessing the Army’s Future Needs for Temporary Fuel Pipelines pptx

The Value and Impacts of Alternative Fuel Distribution Concepts- Assessing the Army’s Future Needs for Temporary Fuel Pipelines pptx

... improved pipeline set with then state-of -the- art technology was developed in the mid-1970s, together with an associated unit to operate it. is improved pipeline, called the Inland Petroleum Distribution ... and nonlinear warfare. If so, there is a further question of whether the Army should reallocate the resources associ- ated with the pipeline force structure to fill other for...
Tài liệu Andersen’s Fairy Tales - THE EMPEROR’S NEW CLOTHES docx

Tài liệu Andersen’s Fairy Tales - THE EMPEROR’S NEW CLOTHES docx

... go either to the theatre or the chase, except for the opportunities then afforded him for displaying his new clothes. He had a different suit for each hour of the day; and as of any other king ... finish the Emperor’s new suit. They pretended to roll the cloth off the looms; cut the air with their scissors; and sewed with needles without any thread in them. ‘See!’ cried t...
Ngày tải lên : 14/12/2013, 08:15
  • 9
  • 388
  • 1
Tài liệu CHUỔI CUNG ỨNG THÂN THIỆN - INTIMATE SUPPLY CHAIN docx

Tài liệu CHUỔI CUNG ỨNG THÂN THIỆN - INTIMATE SUPPLY CHAIN docx

... tới Dây chuyền cung ứng trọng tâm là khách hàng (Customer-centered supply chain) . Một môi trường mới định hướng theo nhu cầu (A New Demand-Driven Environment). Để thấu hiểu bản chất và các lợi ... Quản lý dây chuyền cung ứng (Supply chain management - SCM). Theo một nghiên cứu gần đây của công ty phân tích AberdeenGroup, các chiến lược cốt lõi này được thiết kế theo đúng 5 yêu...
Ngày tải lên : 20/12/2013, 18:15
  • 18
  • 514
  • 0
Tài liệu The analyst''''s style manual docx

Tài liệu The analyst''''s style manual docx

... clear if they were not connected as a compound adjective. Right-of-way Cross-reference High-level post 24 Yet-undetermined outcome UN-initiated talks Parentheses 3.20 Parentheses ... the apostrophe and the letter s. • If a word (either singular of plural) does not end in s, add an apostrophe to form the possessive. the woman’s book the women’s shoes the child’s...
Ngày tải lên : 14/02/2014, 20:20
  • 44
  • 618
  • 0
Tài liệu The Armed Forces Officer Department of the Army Pamphlet 600-2 docx

Tài liệu The Armed Forces Officer Department of the Army Pamphlet 600-2 docx

... in their heads. They think they can develop them clearly. But when they try to apply a largely dormant vocabulary to the expression of these thoughts, the result is stiff and selfconscious. The ... course he moves slowly up the hill. He comes to the top and his pace quickens. Well, then, what happens? The taller men are at the top of the column, and they lengthen their stride...
Ngày tải lên : 18/02/2014, 12:20
  • 155
  • 487
  • 0

Xem thêm