... and target: Production in time under adherence to of the quality and environmental specifications Interfaces Supplier: Document Process input R02-Order settling order (PPS) Production ... deposited in the item stock in the field main group. After the ready message of the EDP, the product is automatically detected as " deliverable " and is ready for the further use...
Ngày tải lên: 22/12/2013, 02:18
Tài liệu ETHICS IN ENGINEERING pptx
... (half-life = 24,110 yrs) Normally, 10 half lives are required before a Pu-239 contaminated area is considered safe again, in the case of plutonium, roughly 250,000 years. So if Pu leaked, say, due ... come up in these discussions: Issues (cont.): ISSUE #1: HEALTH AND SAFETY RISKS, FURTHER CONSIDERATIONS: a) The possibility of medical science discovering a cure for cancer someti...
Ngày tải lên: 13/02/2014, 20:20
Tài liệu MacRuby in Action pptx
... viewing. CUSTOMIZING THE MAIN WINDOW Stretch out the main window to the size you prefer. For styling purposes, we enabled the textured option in the inspector pane. While you’re still in the inspector ... when the window is resized. ADDING A LOADING INDICATOR When the browser is actually loading something, it’s nice to indicate that to users in the interface. You’ll use the NSProgessIn...
Ngày tải lên: 17/02/2014, 15:20