PB-Nr: S09.01 Management of waste material Issued by Date of release Version page Herr Bauer Juli 2002 1 1/6 1. Development 1 2. Production 2 2.1 Production entirely 2 2.2 Production Powder 3 2.3 Production CB, KH 3 2.4 Production Wet lacquer 3 2.5 Production Synthetic resin 4 3. Administrative /selling 4 4. Building services 5 1. Development/technical school 2000 1.1 Powder waste is collected at the developing place (laboratory extrusion) sort clean and brought daily to the appropriate container of the collecting point II After notification of the appropriate Entsorgers the full container is fetched. 1.2 1,2 Remainder waste out to all departments the resulting remainder waste one brings from the cleaning personnel to the waste collecting point II and one transfers with internal truck to the Entsorger For the area development/technical school 2000 was created in the mill space an intermediate collecting point for the following waste materials 1.3 waste paper Waste paper one collects separately and one brings solely responsible to the container of these intermediate collecting points. Contents of this container will transfer according to its requirement directly the recycling company for recycling. The feed takes place with that own truck. 1.4 aluminum sheet metals Entsorgende test sheet metals are separately collected and transferred solely responsible to the central collecting point II. These aluminum sheet metals will transfer to internal truck of the recycling company with that for recycling. 1.5 spray doses Remainder-emptied spray doses are stored temporarily in a container of the own collecting point and transferred with own truck to the Entsorger. 1.6 packing from plastic and network materials Light packing is collected and stored temporarily separately in a container as well as brought according to requirements and solely responsible to the collector with the collecting point I. The disposal takes place via collection of the local waste organization. PB-Nr: S09.01 Management of waste material Issued by Date of release Version page Herr Bauer Juli 2002 1 2/6 2. Production 2.1 production entirely 2.1.1 aluminum sheet metals Test sheet metals are separately collected and transferred solely responsible to the central collecting point II. These aluminum sheet metals will transfer to internal truck of the recycling company with that for recycling. 2.1.2 wood pallets The resulting one-way pallets are collected and stored temporarily. The disposal takes place via the logged passing on to our coworkers. 2.1.3 paper/plastic bundle, sample bags for test sheet metals The one-way raw material bundles is remainder-emptied, collected in lattice boxes and supplied to the waste collecting point II. Paper and plastic are pressed, tied and stored temporarily separated, to bundles. In one-week rhythm the bundles with internal truck are brought to the customer (demand-related). this material, which results from the application as binder with easy burying, contaminates. 2.1.4 Saw waste This material is collected, labeled and in the waste collecting point I for the collection by the waste company stored temporarily. 2.1.5 Various residual substances Out all areas the resulting remainder waste in the waste collecting point II one collects and with internal truck to the waste company one transfers. 2.2 Production Powder coatings 2.2.1 Powder waste Beginning Machines Cab powder Cabine powder Waste and cleaning granulate PB-Nr: S09.01 Management of waste material Issued by Date of release Version page Herr Bauer Juli 2002 1 3/6 Fine powder of the sucking unit Fine powder of sucking unit Used cleaning resin Non conforming raw materials Fine powder of the vacuum cleaner Non conforming coarse material Returned powder for waste Quality related waste is collected, weighed in Big Bag's and transferred to the waste collecting point II. The BL takes over and documents the marked cradle note the quantities of waste. After notification of the appropriate waste company the full container is fetched. Collecting points: Beginning collecting station is apart from the originally weighted-in quantity in the beginning. Machines collecting station beside the suction cab. Cab powder station is in the stock area of the training products. Collector: Within the machine area the types of dust, over grain etc. are collected exclusively in yellow bags. The resounding waste and also the Kehricht are collected in the yellow bucket. The bucket of the resounding waste must be emptied regularly and latest to laminating. Distortions of the material at the cooling tape is no waste, but the material must be granulated after the cooling 2.3 Production Color Batch, Synthetic resin 2.3.1 Powder waste exposes itself together: Soil waste remainder types of dust of the system cleaning remainder types of dust of exhausts granulates this resounding waste is collected and weighed in bundles In a container of the waste collecting point II designated for it contents of these barrels are emptied. After notification of the appropriate waste company the full container is fetched 2.4 production of wet lacquers 2.4.1 sheet metals (doses) PB-Nr: S09.01 Management of waste material Issued by Date of release Version page Herr Bauer Juli 2002 1 4/6 sheet metals are collected with the accumulation places in bundles, pressed afterwards in the waste collecting point II and stored temporarily in the collecting container up to the collection, placed from the waste company to the order. 2. 4.2 PVC containers Raw material containers, which are no longer usable after repeated application, are transferred to the waste company depending upon remainder contents. 2.4.3 Cleaning solution water-mixable Solvents (55510) are collected, labels and in the waste collecting point I up to the collection stored temporarily. Water-mixable dirty solvents (55502) are not regenerated in the distilling plant (see KH). 2.5 production synthetic resin 2.5.1 Ester distillate from synthetic resin production The quantities of ester distillate, resulting from the condensate container of the exhaust air duct, as well as the not burnable proportions from the condensate container to the burn is attached, in barrels are collected, accordingly labelled and in the waste collecting point I up to its collection by the waste company stored temporarily. 2.5.2 Lacquer mud from distillation The full lacquer mud barrels is stored temporarily after intended indication in the waste collecting point I up to the transfer to the waste company. 2.5.3 Solvents from that wire cleaning/laboratory The solvents from the wire cleaning are collected in supplied barrels. The full barrels are intended labelled and stored in the waste collecting point I up to the transfer by the waste company. 2.5.4 Carrier oils from the heating used carrier oil in barrels intended one fills, one indicates accordingly and one stores temporarily in the waste collecting point I up to the collection by the waste company. 3. Administrative/selling (office area) 3.1 papierabfaelle office area PB-Nr: S09.01 Management of waste material Issued by Date of release Version page Herr Bauer Juli 2002 1 5/6 waste paper is separately collected and solely responsible to the collecting points with the appropriate paper containers (DIY stocks or fax space 2. Stick) brought. Contents of these containers will transfer to the recycling company for recycling. The feed takes place demand-related with that own truck. 3.2 printer tapes and printer cartridges These are returned to the use of the department of purchase and passed on to a reprocessing company. 3.3 used batteries These are collected central and executed by the building services disposal according to requirements and the correct. 4. Building services 4.1 wastes of electrician and Installateure The Professionisten are responsible for the disposal of the waste caused by you (cable remainders, fluorescent tubes, piping wastes etc.). 4.2 scrap irons Scrap irons and steel sheets are stored in a container behind lock-making. The disposal takes place via collection of the recycling company. 4.3 waste oils Waste oil, as maintenance waste, in appropriate containers one collects and one stores temporarily in the waste collecting point I. 4.4 garden waste The garden waste directly with developing to the Entsorger will transfer. Cleaners results 4.5 oil water mixture This group of wastes from the remainders of the hydraulic. After appropriate labeling and the temporary storage in the waste collecting point I it will transfer to the Entsorger. 4.6 oil separators PB-Nr: S09.01 Management of waste material Issued by Date of release Version page Herr Bauer Juli 2002 1 6/6 Maintenance of our oil separators takes place via the maintenance or directly via the Entsorger. . recycling company. 4.3 waste oils Waste oil, as maintenance waste, in appropriate containers one collects and one stores temporarily in the waste collecting. mill space an intermediate collecting point for the following waste materials 1.3 waste paper Waste paper one collects separately and one brings solely responsible