Phòng KHĐT Dự thảo SOCIALIST REPUBLIC OF VIETNAM Freedom – Independence – Happiness ** -CONTRACT APPENDIX No To Contract No: 88 /HĐXD-VEC/2009 Reference : Extending of Improvement of the procedure and acceptance process for payment in Noi Bai - Lao Cai Highway project I BASIS FOR SIGNING CONTRACT: - Decision of MOT on approving the Investment in the Noi Bai - Lao Cai Highway project (phase 1), Ref No.3415/QD-BGTVT dated 5th November, 2007 - Decision of VEC on Approving the Technical Design of Package Ai of Noi Bai – Lao Cai Highway project (phase 1), Ref No.294/QD-VEC dated 27th November, 2008 - Decision of MOT on approval for Bidding Plan and Bidding Documents of Package A of Noi Bai – Lao Cai Highway project, Ref No.754/QD-BGTVT dated 27th March, 2009 - Decision of MOT on approval for Bidding Results of Package A of Noi Bai – Lao Cai Highway project (phase 1), Ref No.3199/QD-BGTVT dated 2nd November, 2009 - Decision of ADB on Loans 2391/2392-VIE: GMS Kunming - Hai Phong Transport Corridor – Noi Bai - Lao Cai Highway project - Approval for Bid Evaluation for Civil Works Contract A dated 22nd October, 2009 - Contract No / HĐXD-VEC/20 between Vietnam Expressway Corporation and _ - Letter No 2192/ VEC-TĐ of VEC dated 01 November 2011 about Improvement of the procedure and acceptance process for payment in NBLC Today, _November 2011, in office of Vietnam Expressway Corporation (VEC) at Nam Street - Hoang Mai District - Hanoi, Vietnam, we include: II SIGNING PARTIES: Part A: - Name Address : Vietnam Expressway Corporation (VEC) : Linh Nam Street - Hoang Mai District - Hanoi, Vietnam Represented by : Mr Mai Tuấn Anh Draft by: Thang.CM Page /20 Position : General Director - Tel : 04.364 30266 - Account No Fax : 04 364 30270 Position : General Director : Part B: - - Name : - Address : Represented by : - - Tel : Fax - Account No : - Tax code : Business License No : : granted by Hanoi Planning and Investment Department Two parties agreed to sign the Appendix of Contract No: _/HĐXD-VEC/20 _ in order to Improvement of the procedure and acceptance process for payment of Project “Noi Bai – Lao Cai Highway project (phase 1) - Pakage A _” with the following Articles: Article 1: Payment with condition: 1.1 Common excavation: When contractor have enough quality document to confirm quality and quantity on site; exception of objective condition e.g lack of quality certificate of borrowed pit It will be accepted to pay 80% of unit price after the engineer issues payment certificarte with condition Condition is limit time to complete all quality document in contractor’s commitment letter for conducting and management The contractor must complete full quality document before approval of acceptant completed payment stage 1.2 Structure works: 1.2.1 Bored pile works: Payment process will be applied by this appendix instead of letter No.738/VEC-TD dated 22nd October 2010 Bored pile works waiting sonic test shall have been accepted to pay with condition since 31st October 2011 Condition of the quality documents must be completed in time as specified in the Contractor's commitment letter It is accepted to pay 80% of unit price after having accepted results of concrete strength test at days age 1.2.2 Concrete works: It is accepted to pay 80% of unit price after having accepted results of concrete strength test at days age Draft by: Thang.CM Page /20 1.2.3 Load test or Load static test Unified payment to two times: - First time: 50% of unit price when implemented test at site with engineer’s confirmation - Second time: in accordance with the provisions of the contract 1.3 Deduction payment in next interim payment (IPC) The Contractor must have commitment letter about lacking documents with completed time in every IPC When due, if the contractor can not contribute supplement document as commitment letter The corresponding value will be deducted from the value paid for next IPC’s value Article : Payment to material delivery to site under article 14.5 Prefabricated material (Pipe culverts, concrete curbs, precast concrete plank for formwork of PCI- girder (06220-10), concrete retaining wall… and bridge girders): 2.1 Bridge girders: Unified value payment is 80% contract’s unit price upon the contractor completely fabricates bridge girders and have accepted results of concrete compression test at days age (0.9 R28) 2.2 RC pipe culverts Unified value payment is 60% contract’s unit price after RC pipe culvert is fabricated with days age RC pipe Culverts gaining strengths is delivered to site 2.3 Precast concrete curb Unified value payment is 80% contract’s unit price after concrete curb is fabricated with days age Concrete curb gaining strengths is delivered to site 2.4 Other prefabricated structures Unified rules for temporary payment of other prefabricated structures to be paid when fabricating structures reached concrete strength at days age and deliveried on site Temporary payment value: prefabricated structures shall be calculated by contractor equivalent with contract unit price It will be confirmed by the Engineer, and approved by EPMU and report to VEC following the comply with all the necessary formalities List of additional materials to be paid under article 14.5 Unified addition of other materials to be paid under Article 14.5 (except for kinds of materials specified in the Contract) Which they are fences, guard rails, elastomeric bearing pad (rubber and steel), tension cable Draft by: Thang.CM Page /20 2.5 Unified value payment of 50% unit price mentioned in the BOQ for grassing with fertilizer (item 08150-01) after the completed and inspected quantity of sodding has been completed at site for 10 days 2.6 For the item No 03200-04 - special cofferdams for Lo river bridge pirers P4 to P7 (4 pirers) shall be pay advance as follows: i, Advance 30% after the contractor starts construction, ii, Continue advance payment 20% after contractor completely drivings special cofferdams, iii, Continue advance payment 30% after the contractor completely pours sealing concrete, iv, Final payment after the contractor remove special cofferdams and restore previous status Article : Allow the contractor can more than 01 IPC in 01 (one) month to ensure value more than billion Vietnam dong Article : Common regulations 3.1 This Appendix shall take effect from the date of signing and expire when two Part finish all the content and obligations in the Contract 3.2 This appendix contract is made into 09 (nine) originals in Vietnamese and (nine) originals in English with the equal legal value Part A keeps (four) originals, Part B keeps (four) originals and the Engineer keeps (one) Representative of the Contractor Representative of the Employer Draft by: Thang.CM Page /20 CỘNG HÒA XÃ HỘI CHỦ NGHĨA VIỆT NAM Độc lập – Tự – Hạnh phúc ** BỘ GIAO THÔNG VẬN TẢI TỔNG CÔNG TY ĐẦU TƯ PHÁT TRIỂN ĐƯỜNG CAO TỐC VIỆT NAM DỰ ÁN XÂY DỰNG ĐƯỜNG CAO TỐC NỘI BÀI – LÀO CAI GÓI THẦU A1 PHỤ LỤC HỢP ĐỒNG SỐ 1-A Của Hợp đồng sSố: /HĐXDPLHĐ-VEC/2012 Tham chiếu: Cải thiện thủ tục, qui trình nghiệm thu tốn, biện pháp đảm bảo tiến độ dự án Nội Bài - Lào Cai I CƠ SỞ KÝ KẾT HỢP ĐỒNG - Quyết định số 3415/QD-BGTVT ngày 5/11/2007 BGTVT việc phê duyệt đầu tư Dự án đường cao tốc Nội Bài - Lào Cai (giai đoạn 1), Quyết định số 294/QD-VEC ngày 27/11/2008 Công ty Đầu tư Phát triển đường cao tốc Việt Nam việc phê duyệt Thiết kế Kỹ thuật gói thầu Ai Dự án đường cao tốc Nội Bài – Lào Cai (giai đoạn 1), Quyết định số 754/QD-BGTVT ngày 27/3/ 2009 BGTVT việc phê duyệt Kế hoạch đấu thầu Hồ sơ đấu thầu gói A Dự án đường cao tốc Nội Bài - Lào Cai - Quyết định số 3199/QD-BGTVT ngày 2/11/2009 BGTVT việc phê duyệt kết gói thầu gói thầu A Dự án đường cao tốc Nội Bài - Lào Cai (giai đoạn 1), - Quyết định ADB vốn vay 2391/2392-VIE: dự án hành lang giao thơng KunningHải Phịng, Nội Bài Lào Cai - Phê duyệt đánh giá đấu thầu cho Hợp đồng xây dựng - A ngày 22/10/2009 - Hợp đồng số / 75/ HĐXD-VEC/2009 Công ty Đầu tư Phát triển đường cao tốc Việt Nam Công ty POSCO E&C; _ Công văn số 738/ VEC-TĐ of VEC ngày 22/10/2010 việc toán số hạng mục Dự án NBLC - Công văn số 2192/ VEC-TĐ of VEC ngày 1/11/2011 việc cải thiện qui trình, thủ tực nghiệm thu tốn Dự án NBLC - Căn thư số GET/EPMU1/A1/335 ngày 5/12/20112…… việc đề xuất quy trình tốn… - Căn thư số GE-EPMU-1116 … ngày 58/12…… /2011 việc trình nộp phụ lục hợp đồng số 1;…… - Căn thư số… Nhà thầu kiến nghị thay đổi bổ xung điều khoản tốn… Hơm nay,… /1101/20112012, văn phịng tổng Tổng cơng Cơng ty đầu Đầu tư phát triển đường cao tốc Việt Nam ( VEC), Đường Lĩnh Nam, Quận Hoàng Mai, Hà Nội, Việt Nam, gồm: Draft by: Thang.CM Page /20 II CÁC BÊN KÝ KẾT: BÊN Bên A: Tên : Tổng Công ty đầu Đầu tư phát triển đường cao tốc Việt Nam (VEC) - Địa - : Đường Lĩnh Nam, Quận Hoàng Mai, Hà Nội, Việt Nam Đại diện - - : Ông Mai Tuấn Anh Chức vụ Địa : Tổng Giám đốc : Phường Lĩnh Nam, Quận Hoàng Mai, Hà Nội, Việt Nam - Điện thoại - : 04.364 30266 Fax - : 04 364 30270 Tài khoản số : BÊN Bên B: Công ty Posco Engineering & Construction Co., Ltd - - Đại diện : - Chức vụ : - Địa : Điện thoại - - Đại diện - Fax : - Tên : - Địa : : Chức vụ Điện thoại - : : :Tổng Giám đốc Fax - Tài khoản số : - Mã số thuế : : Giấy phép ĐKKD : Sở kế hoạch đầu tư thành phố Hà Nội cấp Tư vấn giám sát Getinsa… Hai bên đồng thuận ký Phụ lục hợp đồng cho Hợp đồng số: _/ 75/HĐXD-VEC/20 _09 nhằm cải thiện thủ tục qui trình nghiệm thu tốn có biện pháp đảm bảo tiến độ Dự án đường cao tốc Nội Bài – Lào Cai (giai đoạn 1) – Gói thầu A _” với điều khoản sau đây: Điều khoản 1: Phân kỳ toánChia nhỏ toán số hạng mục có điều kiện: - Chia nhỏ toán hạng mục cọc khoan nhồi (06210-01, 06210-02, 06210-03): Thanh toán lần 1: 80% sau Nhà thầu thi cơng xong có kết thí nghiệm nén mẫu bê tơng cọc ngày thí nghiệm siêu âm đạt u cầu Thanh tốn lần 2: 20% sau hồn thành công việc đáp ứng yêu cầu hợp đồng 2 Chia nhỏ toán hạng mục Thử tải (06210-04, 06210-05): Hạng mục đào thông thường: Draft by: Thang.CM Page /20 điều kiện Khi Nhà thầu có đủ tài liệu nghiệm thu xác nhận chất lượng khối lượng trường (thiếu số thủ tục điều kiện khách quan ví dụ thiếu thủ tục pháp lý cho mỏ vật liệu mượn) chấp nhận toán 80% đơn giá hợp đồng sau Tư vấn đồng ý cấp chứng tốn có điều kiện Điều kiện để kiểm soát quản lý qui định thời gian để hoàn thành tất tài liệu theo giấy tờ cam kết Nhà thầu Khi toán chuyển giai đoạn phải có đầy đủ hồ sơ Công tác kết cấu: Cọc khoan nhồi: Qui trình tốn áp dụng theo phụ lục thay cho thư số 738/VECTD ngày 22/10/2010 Một số cọc thi cơng ngày 31/10/2011 chưa có thí nghiệm sonic chấp nhận tốn có điều kiện Điều kiện tài liệu chất lượng phải hoàn thành thời gian theo thư cam kết hoàn thành Nhà thầu Hạng mục toán 80% đơn giá hợp đồng sau có kết thí nghiệm cường độ bê tông ngày đạt yêu cầu Chấp nhận tốn 80% đơn giá hợp đồng sau có kết thí nghiệm cường độ bê tơng ngày đạt yêu cầu 10 Thí nghiệm O-cell thí nghiệm tải tĩnh: 11 - Bê tơng: Thống tốn làm lần: Thanh toán lầnLần 1: 50% giá dự toán tập kết vật tư, vật liệu, thiết bị đến trường triển khai thí nghiệm trường Tư vấn xác nhận Lần Thanh toán lần 2: 50% sau hồn thành cơng việc đáp ứng yêu cầu điều kiện hợp đồngtheo qui định Hợp đồng 12 - Chia nhỏ tốn hạng mục Bê tơng (06100-01, 06100-02, 06100-03, 06100-04, 06100-05, 06100-08): Thanh toán lần 1: 80% sau Nhà thầu thi cơng xong có kết thí nghiệm nén mẫu bê tơng ngày đạt u cầu Thanh tốn lần 2: 20% sau hồn thành cơng việc đáp ứng yêu cầu điều kiện hợp đồng 13 Chia nhỏ toán hạng mục Dầm cầu (06220-03, 06220-04, 06220-05, 06220-06, 06220-07, 06220-08, 06220-09): - Thanh toán lần 1: 80% sau Nhà thầu thi cơng xong có kết thí nghiệm nén mẫu bê tơng ngày đạt yêu cầu, căng kéo hoàn chỉnh cáp dự ứng lực kiểm tra độ vồng đạt yêu cầu Thanh tốn lần 2: 20% sau hồn thành cơng việc đáp ứng yêu cầu điều kiện hợp đồng 14 - Chia nhỏ toán hạng mục Tấm ván khuôn đúc sẵn cho dầm I bê tông dự ứng lực (06220-10): Thanh toán lần 1: 80% sau Nhà thầu thi cơng xong có kết thí nghiệm nén mẫu bê tông ngày đạt yêu cầu Thanh tốn lần 2: 20% sau hồn thành cơng việc đáp ứng yêu cầu điều kiện hợp đồng 15 Chia nhỏ tốn hạng mục Cống trịn (04300-02, 04300-03, 04300-04, 04300-05, 04300-06, 04300-07, 04300-08, 04300-09, 04300-10, 04300-11, 04300-12, 04300-13, 0430014, 04300-15): Draft by: Thang.CM Page /20 - Thanh toán lần 1: 60% sau Nhà thầu thi công xong tập kết công trường kết thí nghiệm nén mẫu bê tơng ngày đạt u cầu có Thanh tốn lần 2: 40% sau hồn thành cơng việc đáp ứng u cầu điều kiện hợp đồng 16 Khấu trừ toán chứng Nhà thầu phải có giấy tờ cam kết thời gian hoàn thành thủ tục thiếu hồ sơ toán tạm Trong trường hợp đến hạn, Nhà thầu không thực nghiêm túc điều kiện cam kết theo qui định, phần giá trị tương ứng bị khấu trừ vào giá trị toán kỳ Điều khoản : Thanh tốn vật liệu đến cơng trường theo điều khoản 14.5 Vật liệu đúc sẵn (Đoạn cống trịn, bó vỉa, ván khuôn đúc sẵn cho dầm I bê tông dự ứng lực (06220-10), tường chắn khối bê tông lắp ghép dầm cầu) 2.1 Dầm cầu: Thống giá trị toán 80% đơn giá Hợp đồng hồn thành việc chế tạo phiến dầm, thí nghiệm kết nén mẫu ngày đạt yêu cầu (0.9 R28) 2.2 Cống trịn 17 Thống giá trị tốn 60% đơn giá Hợp đồng ống cống chế tạo đạt cường độ ngày tập kết cơng trường.7 Chia nhỏ tốn hạng mục Bê tơng bó vỉa (08920-01, 08920-02): - Thanh tốn lần 1: 50% sau Nhà thầu thi công xong tập kết cơng trường có kết thí nghiệm nén mẫu bê tơng ngày đạt u cầu Thanh tốn lần 2: 50% sau hồn thành cơng việc đáp ứng yêu cầu điều kiện hợp đồng - 18 Chia nhỏ toán hạng mục Trồng cỏ có phân bón (08150-01): Thanh tốn lần 1: 50% đơn giá hợp đồng cho phần khối lượng nhà thầu trồng cỏ xong Thanh tốn lần 2: 50% sau hồn thành công việc đáp ứng yêu cầu điều kiện hợp đồng 19 Chia nhỏ toán hạng mục Cọc ván đặc biệt cho trụ P4 đến P7 (4 trụ) cầu Sông Lô (03200-04): 20 21 22 Thống giá trị toán 80% đơn giá Hợp đồng sau cục bó vỉa chế tạo đạt cường độ bê tông ngày tập kết đến cơng trường 23 24 Cục bê tơng bó vỉa Kết cấu đúc sẵn khác: Thống nguyên tắc tạm toán kết cấu đúc sẵn khác toán việc chế tạo kết cấu đạt cường độ bê tông ngày tập kết công trường, 25 Giá trị tạm tốn: Nhà thầu tính toán tương đương với giá trị kết cấu đơn giá Hợp đồng, TVGS xác nhận, ban QLDA chấp thuận báo cáo VEC làm thủ tục cần thiết 26 Danh sách vật liệu bổ sung toán theo điều 14.5 27 Thống bổ sung vật liệu khác toán theo điều 14.5 (ngoại trừ loại vật liệu qui định Hợp đồng) Vật liệu khác: hàng rào, lan can bảo vệ, gối cầu (cao su thép), cáp dự ứng lực Draft by: Thang.CM Page /20 28 Thống toán 50% theo đơn giá hợp đồng cho hạng mục trồng cỏ có phân bón (mục 08150-01) sau nhà thầu thi công trồng cỏ xong nghiệm thu cơng việc vịng 10 ngày 29 30 Đối với hạng mục số 03200-04 - Cọc ván đặc biệt cho trụ P4 đến P7 (4 trụ) cầu Sơng Lơ thực tạm ứng sau: Thanh toán lần 1: i, Tạm ứng 30% giá trị tập kết vật tư, vật liệu, thiết bị đến trường bắt đầu thi công Tư vấn xác nhận 31 32 Thanh toán lần 2: 20% sau nhà thầu đóng xong vịng vây ván thép Thanh toán lần 3: 30% sau nhà thầu đổ xong bê tông bịt đáy hút cạn nước hố móngsau nhà thầu bắt đầu thi cơng, 33 34 ii, Tạm ứng tiếp 20% sau nhà thầu đóng xong vòng vây ván thép iii, Tạm ứng tiếp 30% sau nhà thầu đổ xong bê tông bịt đáy, 35 36 37 Thanh toán lần 4:iv, 20% sau hồn thành cơng việc đáp ứng u cầu điều kiện hợp đồng 10 Thanh tốn phần cịn lại sau nhà thầu dỡ bỏ cọc ván khôi phục lại nguyên trạng.Khấu trừ toán: - Các khoản giữ lại theo quy định điều kiện hợp đồng; - Đối với hạng mục chia nhỏ toán mục 1,2,3,4,5,6,7,8: Trong trường hợp khối lượng thi công tốn khơng đáp ứng u cầu điều kiện hợp đồng bị khấu trừ đợt toán Điều khoản 2: Bổ sung vật liệu bổ sung toán theo điều 14.5: Bổ sung vật liệu khác toán theo điều 14.5 bao gồm: - Hàng rào; Lan can bảo vệ; Gối cầu (cao su thép); - Cáp dự ứng lực Việc toán áp dụng theo điệu kiện hợp đồng gốc Điều khoản : Cho phép nhà thầu làm nhiều 01 IPC 01 (một) tháng không giới hạn giá trịtháng đảm bảo giá trị lớn tỷ đồng Việt Nam Điều khoản 4: Bổ sung nội dung sau vào Điều kiện hợp đồng, Mục 8.7 Những thiệt hại chậm trễ: Khi nhà thầu chậm tiến độ so với Tiến độ thi công chi tiết phê duyệt 10% bị Chủ đầu tư cảnh cáo lần văn tháng liên tiếp mà tiến độ thực tế không bắt kịp tiến độ duyệt, Chủ đầu tư Nhà thầu thống áp dụng điều khoản Nhà thầu phụ định – Mục Điều kiện hợp đồng Mọi chi phí phát sinh để Nhà thầu phụ định thực công việc Nhà thầu chi trả kinh phí Khi nhà thầu chậm tiến độ so với Tiến độ thi công phê duyệt từ 10% trở lên bị Chủ đầu tư cảnh cáo lần văn tháng liên tiếp mà tiến độ thực tế không Draft by: Thang.CM Page /20 bắt kịp tiến độ duyệt, Chủ đầu tư có quyền dừng tất cơng việc Nhà thầu tịch thu bảo lãnh thực hợp đồng Nhà thầu, tất tổn thất xảy Nhà thầu chi trả Điều khoản : Các điều kiện chung - 3.1 Phụ lục hợp đồng phần hợp đồng số 75/HĐXD-VEC/2009 Trong trường hợp xảy xung đột nội dung phụ lục chiếm ưu so với tài liệu khác hợp đồng gócsẽ có hiệu lực từ ngày ký kết hết hiệu lực Bên hoàn thành tất nội dung nghĩa vụ Hợp đồng - 3.2 Phụ lục hợp đồng làm thành 912 gốc (Tiếng Anh Tiếng Việt) gốc Tiếng anh với giá trị pháp lý tương đương Trong trường hợp có khác biệt tiếng Anh tiếng Việt tiếng Anh chiếm ưu Bên A giữ 410 bản, Bên B giữ 42 Tư vấn giữ Đại diện Nhà thầuBên B 10 Draft by: Thang.CM Page /20 Đại diện Chủ đầu tưBên A SOCIALIST REPUBLIC OF VIETNAM Freedom – Independence – Happiness ** -MINISTRY OF TRANSPORT CONTRACT APPENDIXNOI BAI - LAO CAI HIGHWAY PROJECT- PACKAGE A1 CONTRACT AMENDMENTD No To Contract No: 88 95.3/PLHĐXD-VEC/2009123 Reference : Extending of Improvement of the procedure and acceptance process for payment in Noi Bai - Lao Cai Highway project I BASIS FOR SIGNING CONTRACT AMENDMENTD: - Decision of MOT on approving the Investment in the Noi Bai - Lao Cai Highway project (phase 1), Ref No.3415/QD-BGTVT dated 5th November, 2007 - Decision of VEC on Approving the Technical Design of Package Ai of Noi Bai – Lao Cai Highway project (phase 1), Ref No.294/QD-VEC dated 27th November, 2008 - Decision of MOT on approval for Bidding Plan and Bidding Documents of Package A of Noi Bai – Lao Cai Highway project, Ref No.754/QD-BGTVT dated 27th March, 2009 - Decision of MOT on approval for Bidding Results of Package A of Noi Bai – Lao Cai Highway project (phase 1), Ref No.3199/QD-BGTVT dated 2nd November, 2009 - Decision of ADB on Loans 2391/2392-VIE: GMS Kunming - Hai Phong Transport Corridor – Noi Bai - Lao Cai Highway project - Approval for Bid Evaluation for Civil Works Contract A dated 22nd October, 2009 - CContract No.795/ / HDĐXD-VEC/20 09 between Vietnam Expressway Corporation and _.POSCO E&C - , Contract Amendment No.795.1/PLHD/VEC-2012, Contract Amendment No.95.2/ PLHD/VEC-2012, No.75.2/ PLHD/VEC-2012 and No.75.3/PLHD/VEC-2013 between Vietnam Expressway Corporation and Vietnam Construction & Import Export Joint stock Corporation; 11 Draft by: Thang.CM Page /20 - The letter no 0529/VC-EC dated March 18th 2013 of Vietnam Construction & Import - Export Joint stock Corporation about “Advance material fee for construction” - ….reply from VEC… - Letter No 919//VEC-KHĐT on 26/03/2013 of Vietnam Expressway Corporation “Hoàn thành PLHĐ huy động giải thể, điều chỉnh giá tạm ứng vật liệu - Completion amendment of mobilization, adjustment price and advance material”; POSCO E&C - Letter No 2192/ VEC-TĐ of VEC dated 01 November 2011 about Improvement of the procedure and acceptance process for payment in NBLC.Power of Attorney Letter Ref.No Today, FebruaryMarch _November 2011,2013 in office of Vietnam Expressway Corporation (VEC) at Linh Nam Street - Hoang Mai District -– Floor 4, & Miltec Building, Lot E2, Cau Giay New Quarter, Yen Hoa Ward, Cau Giay District, Hanoi, Vietnam, we include: II SIGNING PARTIES: Part A: - Name : Vietnam Expressway Corporation (VEC) - Address : Floor 4, & Miltec Building, Lot E2, Cau Giay New Quarter, Yen Hoa Ward, Cau Giay District, HanoiLinh Nam Street - Hoang Mai District - Hanoi, Vietnam - Represented by : DMr Mai Tuấn Anh - Position : General Director - Tel : 04.364 30266 - Fax Account No : 04 364 30270 : Part B: - Name: Vietnam Construction & Import - Export Joint Stock Corporation (VINACONEX.,JSC) - Address : Vinaconex Tower, 34th Lang Ha Street, Lang Ha Ward Dong Da District, Hanoi City, Vietnam 12 Draft by: Thang.CM Page /20 - Represented by : Mr Nguyen Ngoc Diep - Position : Deputy general director - Tel : (844)62849234 - Fax : (844)62849208Name - Address : POSCO E&C Tower, ,36 Song Do-Dong , Yeonsu-Gu, Incheon, : POSCO E&C Co., Ltd 406-840 Korea - Represented by : Mr PARK, YOUNG SOOPark, Yong SooLee, Sang Don - Position : GeneralSenior Vice PresidentProject Manager Director - Tel : 82-32-748-2114 - Fax : 82-32-748-4000 Account No : Tax code : Business License No : granted by Hanoi Planning and Investment Department Two parties agreed to sign the AppendixAmendment of Contract No:: _795.3/HĐXD-VEC/ 20 _0913 in order to facilitateiImprovement of the procedure and acceptance process for paymentimplementation of Project “Noi Bai – Lao Cai HHighway pProject (pPhase 1) Package A81 _” which shall supercede the previous Amendment Ref.No.751 PLHD/VEC2012 with the following Articles: Article 1: Payment with condition: - Common excavation: - 13 Draft by: Thang.CM Page /20 Adjustments for Changes in Cost: Delete the following sentence inSub-Clause 13.8 of Part B [Specific Provisions] under Particular Contract Conditions “Index for Local Labour is taken following Vietnam General Statistics Office” And replace by the following sentence: “Index for Local Labour is taken following Institute of Construction Economics under Ministry of Construction” Article 1: Plants and Materials intended for the Works: Add Delete the first paragraph in SSub-Clause 14.5 [Plants and Materials intended for the Works] to Part B [Specific Provisions] of Section – Particular Conditions of Contract as follows: Delete the first paragraph of Sub-Clause 14.5 of Clause 14 [Contract Price and Payment] under General Contract Conditions: “If this Sub-Clause applies, Interim Payment Certificates shall included, under sub-paragraph (e) of Sub-Clause (14.3), (i) an amount for Plants and Materials which have been sent to the Site for incorporation in the Permanent Works and (ii) a reduction when the contract value of such Plants and Materials is included as part of the Paermanent Works under sub-paragraph (a) of Sub-Clause 14.3[Application for Interim Payement Certificates]” And replaced And replaced byby the following paragraph: “If this Sub-Clause applies, Interim Payment Certificates shall included, under sub-paragraph (e) of Sub-Clause (14.3), (i)an amount for Plants and Materials which have been sent to the Site for incorporation in the Permanent Works or (ii) an amount for Plants and Materials which shall be sent to the Site for incorporation in the Permanent Works based on the approved material delivery Schedule and (iii) a reduction when the contract value of such Plants and Materials is included as part of the Parmanent Works under sub-paragraph (a) of Sub-Clause 14.3[Application for Interim Payement Certificates]” 14 Draft by: Thang.CM Page /20 Conditions Reference Clause in Contract Conditions Adjusted Conditions 14.2 (a) 10% of remaining Accepted Contract Amount payable in the currencies and proportions in which the remaining Accepted Contract Amount is payable 14.2 (b) 21% of amount of the certified Interim Payment Certificate (excluding the advance payment and price adjustment and deductions and repayments of retention); Total 2nd Advance Payment Repayment amortization of advance payment 5: Article :652: Financial Conditions Article 2: Financial Issues Unit Price and value for payment in advance Unit Price The unit price and value for payment in advance of the materials of Pavement Structure shall be shown as following; The unit price for payment in advance of the materials shall beapplied for cases (i) and (ii) shall be shonwnfollowed as following; Item Item Description Unit Quantity Unit Price for Payment (**) Unit Price (*) Material of Sub-base m3 To be confirmed 250,000 200,000 Material of Base m3 To be confirmed 265,000 212,000 Aggregate for Asphalt concrete m3 To be confirmed 275,000 220,000 Bitum ton To be confirmed 18,750,000 15,000,000 (*): Actual Market Unit Price including transportation fee and VAT determined by the Engineer (**): 80% of (*) to be paid upon Materials delivered to Site Unit price for advance ** Amount Itme Item Description Unit Quantity Unit Price * Material of Subbase m3 261.779 274.374 219.499 57.460.228.721 Material of Base m3 135.520 289.157 231.326 31.349.299.520 Aggregate for Asphalt Concrete m3 47.398,77 331.622 265.297 12.574.751.485 15 Draft by: Thang.CM Page /20 Bitum ton 7.848,18 16.276.637 13.021.310 102.193.584.716 Total 203.577.864.442 Note: (*) The unit price proposed in the bid of contractor included price adjustment index at current times (**) Unit price for advance to the contractor, equal to 80% of (*) Procedure and Method of Payment in advance The Contractor shall propose Payment in advance to Suppliers based on accepted Material Schedule (including suppliers to Subcontractors/ Product Suppliers) This payment in advance shall be made as a separate interim payment which is only disbursed upon certified and accepted by the Employer The first payment in advance shall be 50% of total payment in advance for material stated in item under artcile right after signing Contract Amendment and unconditional Bank Guarantee submitted by the main contractor The Contractor and the Bank must have a mutual guarantee for the above advance amount, with the following contents: (i) Only disburse the above advance amount to the suppliers or subcontractors after written concurrence by the Employer; (ii) Disburement shall be implemented within days from the above amount transferred to the Contractor’s account In case the contractor does not make payment to suppliers/subcontractors intentionally with visible evidence, upon requested by the Employer, the Bank shall be responsible to repay the advance amount to the Employer unconditionally (iii) The Bank is responsible for providing payment evidence for the above amount for the Employer’s monitoring and management purpose On the employer’s request, The Bank will provide the payment evidence unconditionally which not be subject to the Contractor Guarantee for payment in advance The Contractor has to submit a guarantee in amounts equal to total amount of payment in advance for intended main material for the Pavement Structure Works This amount shall be gradually deducted in accordance with repayment progress Content of the Guarantee shall be in accordance with the Employer’s request and approved by the Employer The Guarantee shall be submitted to the Employer before making payment in advance for material Supplying management The Contractor has to sign direct subcontract with Material Suppliers or via subcontract between Subcontractor/ Product Supplier and Material Supplier in order to ensure transparency of cash flow management Payment Method Based on approved Material delivery schedule, the Contractor shall submit request for payment in advance as Interim Payment Certificates on monthly basis Guarrantee for payment in advance 16 Draft by: Thang.CM Page /20 The Contractor has to submit a guarantee in amounts equal to total amount of payment in advance for intended material for the Works which shall be gradually deducted in accordance with repayment progress Special account for payment in advance The Contractor shall establish a special account for securing finance for supplying Materials intended for the Works Payment to the suppliers shall only be released in conditions of having been certified and approved by the Employer Supplying management The Contractor has to sign direct contract with material suppliers in order to ensure transparent cash flow management - The Contractor shall establish a special account for securing finance for supplying Materials intended for the Works - The Contractor has to sign direct contract with material suppliers - Payment to the suppliers shall only be released in conditions of having been certified and approved by the Employer Article 3: General Conditions - - The provisions 2,3 and of Article shall only be applied for case (ii), payment conditions for case (i) [Materials which have been sent to the site] shall be remained as mentioned in the original Contract Conditions with integration of the provision of Article - -The Amendment shall be a part of the Contract No.795/HĐXD-VEC/2009, Contract Amendment No.795.1/PLHD-VEC/2012, Contract Amendment No.95.2/PLHD-VEC/2013, No.75.2/PLHD-VEC/2012 and No.75.3/PLHD-VEC/2013 and shall supercede the previous Amendment Ref.No.75.1 PLHD/VEC-2012 dated 28th February 2012 between Vietnam Expressway Corporation and Vietnam Construction & Import - Export Joint Stock CorporationPOSCO E&C - The AmendmentAdemdum shall be the first priority and prevail over all remaining Contract Documents in term of discrepancy and disputes - The other conditions of Contract No.795/HĐXD-VEC/2009, Contract Amendment No.795.1/PLHD-VEC/2012, Contract Amendment No.95.2/PLHD-VEC/2013 , No.75.2/PLHD-VEC/2012 and No.75.3/PLHD-VEC/2013 between Vietnam Expressway Corporation and Vietnam Construction & Import - Export Joint Stock CorporationPOSCO E&C that are not mentioned under this Amendment will be intact with same validity - The Admendmentemdum shall be made in 12 original sets (English and Vietnamese) having equal legality The Enlgish shall be prevailed and ruling in case of discrepancy and disputes Party BA shall keep 10 setstes and Party AB shall keep 02 sets Representative of the Contractor Representative of the Employer 17 Draft by: Thang.CM Page /20 -Mr Nguyen Ngoc Diep Deputy general director Representative of the Contractor -Dr Mai Tuan Anh General Director Representative of the Employer -Dr Mai Tuan Anh General Director When contractor have enough quality document to confirm quality and quantity on site; exception of objective condition e.g lack of quality certificate of borrowed pit It will be accepted to pay 80% of unit price after the engineer issues payment certificarte with condition Condition is limit time to complete all quality document in contractor’s commitment letter for conducting and management The contractor must complete full quality document before approval of acceptant completed payment stage Structure works: Bored pile works: Payment process will be applied by this appendix instead of letter No.738/VEC-TD dated 22 nd October 2010 Bored pile works waiting sonic test shall have been accepted to pay with condition since 31st October 2011 Condition of the quality documents must be completed in time as specified in the Contractor's commitment letter It is accepted to pay 80% of unit price after having accepted results of concrete strength test at days age Concrete works: It is accepted to pay 80% of unit price after having accepted results of concrete strength test at days age Load test or Load static test Unified payment to two times: First time: 50% of unit price when implemented test at site with engineer’s confirmation Second time: in accordance with the provisions of the contract Deduction payment in next interim payment (IPC) The Contractor must have commitment letter about lacking documents with completed time in every IPC When due, if the contractor can not contribute supplement document as commitment letter The corresponding value will be deducted from the value paid for next IPC’s value Article : Payment to material delivery to site under article 14.5 Prefabricated material (Pipe culverts, concrete curbs, precast concrete plank for formwork of PCI- girder (06220-10), concrete retaining wall… and bridge girders): 18 Draft by: Thang.CM Page /20 Bridge girders: Unified value payment is 80% contract’s unit price upon the contractor completely fabricates bridge girders and have accepted results of concrete compression test at days age (0.9 R28) RC pipe culverts Unified value payment is 60% contract’s unit price after RC pipe culvert is fabricated with days age RC pipe Culverts gaining strengths is delivered to site Precast concrete curb Unified value payment is 80% contract’s unit price after concrete curb is fabricated with days age Concrete curb gaining strengths is delivered to site Other prefabricated structures Unified rules for temporary payment of other prefabricated structures to be paid when fabricating structures reached concrete strength at days age and deliveried on site Temporary payment value: prefabricated structures shall be calculated by contractor equivalent with contract unit price It will be confirmed by the Engineer, and approved by EPMU and report to VEC following the comply with all the necessary formalities List of additional materials to be paid under article 14.5 Unified addition of other materials to be paid under Article 14.5 (except for kinds of materials specified in the Contract) Which they are fences, guard rails, elastomeric bearing pad (rubber and steel), tension cable Unified value payment of 50% unit price mentioned in the BOQ for grassing with fertilizer (item 08150-01) after the completed and inspected quantity of sodding has been completed at site for 10 days For the item No 03200-04 - special cofferdams for Lo river bridge pirers P4 to P7 (4 pirers) shall be pay advance as follows: i, Advance 30% after the contractor starts construction, ii, Continue advance payment 20% after contractor completely drivings special cofferdams, iii, Continue advance payment 30% after the contractor completely pours sealing concrete, iv, Final payment after the contractor remove special cofferdams and restore previous status Article : Allow the contractor can more than 01 IPC in 01 (one) month to ensure value more than billion Vietnam dong Article : Common regulations 3.1 This Appendix shall take effect from the date of signing and expire when two Part finish all the content and obligations in the Contract 3.2 This appendix contract is made into 09 (nine) originals in Vietnamese and (nine) originals in English with the equal legal value Part A keeps (four) originals, Part B keeps (four) originals and the Engineer keeps (one) Representative of the Contractor Employer 19 Draft by: Thang.CM Page /20 Representative of the Mr Lee, Sang Dr Mai Tuan Anh Don Park, Senior Vice PresidentProject Manager Director 20 Draft by: Thang.CM Page /20 Yong Soo General

Ngày đăng: 20/11/2023, 21:13

w